There are two primary methods used for removing a scored concrete floor a jackhammer and or a sledgehammer.
Plumbing in concrete floors.
Considerations cutting through a concrete floor should be a last resort.
647 784 8448 or email.
Removing concrete for plumbing.
The center of the lav s drain is located 18 approximately above the finished floor.
Once you have finished scoring all the concrete that lies in the path where the plumbing will be installed it s time to get the concrete out.
Once the trenches are dug you can add the sewer pipes and stub outs pipes that sit above the slab floor that eventually connect the sink toilet bathtub or shower and any other drains to the system.
Also notice the drain is centered right in the middle of this 30 inch vanity.
The top openings should be packed with something to prevent concrete or debris from falling into the line.
The two major plumbing codes in the united states is the ipc international plumbing code and the upc.
When a house is to have a poured concrete slab first floor all the pipes and fittings below the floor level must be put in place before the floor is poured.
Once the concrete is out you can dig in the remaining trench to remove the sand or soil before running the new plumbing.
Plumbing is one of the rough in elements of construction and is generally hidden by the finished elements such as walls floors and roofs.
Here with this video you will learn some of the basic rules of thumb for doing rough in plumbing underground.
The plumbing trenches are typically dug at the same time as the slab footings if any.
Before the concrete trucks come the contractor fills in the area over the network of plumbing pipes and drain lines with compacted sand.
Plumbing drain design for concrete slab houses.
It can also run under sidewalks stoops patios and decks.
Reasons why you should hire concrete floor installers.